Concrete Slab Calculator

Cubic yards and bags of premixed concrete for a slab, patio, shed pad or sidewalk, with a waste allowance.

Units
ft
ft
in

4 in for patios and walks; 5 to 6 in for driveways and garage floors.

%

Covers uneven subgrade, spillage and form flex. 5 to 10% is typical.

Concrete to order
1.36 yd³
Bags, 80 lb (36 kg)
62 bags
Volume before waste
1.23 yd³ (33.3 ft³)
Waste allowance
10%
  • At a cubic yard or more, ready-mix delivery is usually cheaper and far less labor than mixing bags. Ask your supplier about short-load fees under 3 to 4 yd³.

How it works

Volume is length times width times thickness, with thickness converted from inches to feet.

  • Cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12
  • Cubic yards = cubic feet ÷ 27
  • Order volume = cubic yards × (1 + waste % ÷ 100)
  • Bags = order volume in cubic feet ÷ bag yield, rounded up

Worked example

A 10 × 10 ft patio, 4 in thick:

  1. 10 × 10 × (4 ÷ 12) = 33.33 ft³
  2. 33.33 ÷ 27 = 1.23 yd³ before waste
  3. 1.23 × 1.10 = 1.36 yd³ (36.67 ft³) with 10% waste
  4. 36.67 ÷ 0.6 = 61.1, so 62 bags of 80 lb mix

What this assumes

  • Bag yields: 80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³. Check your brand's label.
  • The slab is a flat rectangle of even thickness. Add thickened edges, footings or piers separately.
  • Gravel base, rebar or mesh, and forms are not included.
  • Waste applies to the whole volume, so bag counts round up after waste is added.

Common questions

How many 80 lb bags of concrete make a cubic yard?

About 45. A cubic yard is 27 ft³ and an 80 lb bag yields roughly 0.6 ft³, so 27 ÷ 0.6 = 45 bags before waste.

How thick should a concrete slab be?

4 in is standard for patios, walkways and shed floors. Driveways and garage floors that carry vehicles are usually 5 to 6 in. Local code may set a minimum.

Should I buy bags or order ready-mix?

Bags make sense under about 1 yd³. Above that, ready-mix is usually cheaper per yard and saves hours of mixing, though small loads often carry a short-load fee.

How much extra concrete should I order?

Plan on 5 to 10% extra. Subgrade that is a little low, form bowing and spillage all eat volume, and running short mid-pour leaves a cold joint.

Sources

Spot an error or a number that doesn't match your supplier? Email hello@calculatematerials.com. How these calculators are checked.